Trying to grind to achieve random-traffic tolerances is nearly impossible since as you grind one spot to get it into tolerance you end up putting another out of tolerance. Slabs are not equally flat and level everywhere attempting to correct an out of tolerance random-traffic floor usually requires removal and replacement. F min measurement correlates to the specific dimensions of the lift trucks to be used in the facility. Unlike the more common random traffic F-number system of floor flatness, and floor levelness (FF/FL), which uses statistical analysis to determine the overall floor condition with a 90% confidence level, the F min system is a direct measurement methodology for determining what the VNA trucks will experience while operating in the VNA aisleway. F min quantifies the differential elevations the material handling vehicles will feel as they traverse the aisleways. The F min specification is limited to defined-traffic floors for which narrow or very narrow aisle (VNA) operations are to be conducted. Many times, owners and specifiers will request very high random-traffic specifications when what they really want is a superflat defined-traffic floor. This is common practice in Florida, but not for a superflat floor.Īll too often, specifications are misapplied for F min floors. To minimize problems this could create, we used the hot weather concreting recommendations in ACI 305 and started placements in the late evening, allowing for finishing operations to be done overnight during the coolest part of the day.

WHAT IS A DIPSTICK 2272 FLOOR PROFILER SERIES
But a series of pre-slab construction conferences involving the owner, general contractor, concrete contractor, and floor consultant helped minimize potential problems. ChallengesĮvery project has its challenges, and this one had more than its share.

The facility’s main warehouse is a 56,000-square-foot building with both random-traffic areas and defined-path lift-truck traffic. The slab was constructed in Tampa, Fla., for the new NexLube Blending Facility, an advanced oil re-refining operation that will process up to 28 million gallons of used oil annually. Proper planning and installation techniques combined to make a recent high tolerance, pile-supported structural slab a success.